New CGH2 system architecture, safety compliant with GTR13 Phase 2, allowing up to 20% cost savings
Up to 20% Cost savings vs conventional T4 tanks
· Rationalization of Auxiliaries
· Shorter piping lines
No compromise with Safety and R134 requirements
· Direct mounting of Shut-off valve and TPRD’s on storage volume
Optimized storage capacity
· Lower design coefficient on tank: 2 in replacement 2,25
Easy integration and mounting in vehicle
· Plug& play storage module in replacement of Battery pack
TECHNICALDESCRIPTION
Multicavity tank storage system comprising several type-IV composite vessels connected together
Complete storage systems comprising
· At least one single on-tank valve managing opening / closure of the system aligned with GTR13-Phase2 requirements
· Safety features: Temperature Pressure Relief Devices
· Monitoring devices: Temperature and Pressure (option) sensors
· Frame
Design compliant with GTR13 Phase 2 ; Application expected by 2024-26
APPLICATIONS
Maturity Level: TRL3-4 (PoC realized in 2022) SOP scheduled in 2027
Vehicle / Segment: Passenger Cars / Light Commercial Vehicles (opportunity to be documented for CV on cab module)
Footprint: Worldwide